For the upper deck I preferred to change technique.
I made all the deck beams, and I started laying from the center where there are bilge pumps, then I proceed step by step with the milling and installation in groups of two.
First towards the bow then towards the stern.
The stern will be more complicated because it has the rudder with the maneuvering mechanisms and some interiors.
 
Stern castle
I had to change all the pieces of the kit because they were very fragile and not precise in size.
I insert some images even if everything will be finished after the bridges are completed.
I prefer to do this job after given the delicacy of the windows and details. 800-06-3163.jpg800-06-3164.jpg800-06-3201.jpg800-06-3202.jpg800-06-3203.jpg800-06-3205.jpg800-06-3206.jpg800-06-3207.jpg800-06-3208.jpg800-06-3209.jpg800-06-3210.jpg800-06-3211.jpg800-06-3236.jpg800-06-3265.jpg800-06-3163.jpg800-06-3164.jpg800-06-3201.jpg800-06-3202.jpg800-06-3203.jpg800-06-3205.jpg800-06-3206.jpg800-06-3207.jpg800-06-3208.jpg800-06-3209.jpg800-06-3210.jpg800-06-3211.jpg800-06-3236.jpg800-06-3265.jpg800-06-3267.jpg800-06-3269.jpg800-06-3364.jpg800-06-3365.jpg800-06-3366.jpg800-06-3367.jpg800-06-3382.jpg800-06-3384.jpg
 
Many thanks for starting this building log - I can fully underline the words of our friends here.
Very good - extremely good bashing and additional details - It is a pleasure to see your model -
Many Thanks for showing us what can be done with a good basis
 
Hi,how is your build coming along,do you have any updates?
Yes I went on with the work
Now I try to post the progress.
Despite the emergency COVID-19 fortunately I still have a lot of work because I trade in the laboratory diagnostic sector and lately I have been quite busy.