K kalliboot Joined Oct 9, 2018 Messages 138 Points 143 Mar 11, 2024 #462 Happy birthday and always sensitive fingers in the next year!
M Mirek Joined Dec 9, 2019 Messages 617 Points 353 Mar 11, 2024 #463 Wszystkiego najlepszego . Pozdrawiam Mirek
Herman Joined Mar 14, 2022 Messages 949 Points 403 Location The Netherlands Mar 11, 2024 #464 All the best and a very happy Birthday
GrantTyler Joined May 8, 2021 Messages 5,556 Points 738 Location Cape Town South Africa Mar 12, 2024 #465 Late to the party…again. I hope you had a magic birthday yesterday
Joachim Joined Oct 31, 2019 Messages 218 Points 298 Mar 19, 2024 #467 Thank you We continue with the expansion, rowing benches, oars, cupboards in the stern, etc.
Joachim Joined Oct 31, 2019 Messages 218 Points 298 Mar 25, 2024 #468 Just make the tiller on the lathe and then apply shellac to the boat. Vermilion red decorates the trim and it's finished. We'll move on to the second dinghy in a moment.
Just make the tiller on the lathe and then apply shellac to the boat. Vermilion red decorates the trim and it's finished. We'll move on to the second dinghy in a moment.
M Mirek Joined Dec 9, 2019 Messages 617 Points 353 Mar 26, 2024 #469 Witaj Piękna szalupa . Pozdrawiam Mirek
Joachim Joined Oct 31, 2019 Messages 218 Points 298 Apr 4, 2024 #470 Some Impressions of the second boat
Joachim Joined Oct 31, 2019 Messages 218 Points 298 Apr 11, 2024 #471 The second dinghy is making progress. The planking inside and outside is finished. The benches have been installed.
The second dinghy is making progress. The planking inside and outside is finished. The benches have been installed.
Joachim Joined Oct 31, 2019 Messages 218 Points 298 Apr 13, 2024 #472 The second dinghy is making progress. The planking inside and out is finished. The benches have been installed.
The second dinghy is making progress. The planking inside and out is finished. The benches have been installed.
Joachim Joined Oct 31, 2019 Messages 218 Points 298 Thursday at 10:18 AM #473 Hurray, the two dinghies are finished. A total of 3 months of work, a model building project of it’s own.
Hurray, the two dinghies are finished. A total of 3 months of work, a model building project of it’s own.
B BradNSW Joined Jan 31, 2021 Messages 257 Points 268 Location Loveland, CO Thursday at 12:24 PM #474 This level of attention to detail, patience is the mark of a true master!! As you say, each boat was a project in itself, and they make you build truly wonderful!! Thanks for sharing the great pictures of the process you used on these small boats.
This level of attention to detail, patience is the mark of a true master!! As you say, each boat was a project in itself, and they make you build truly wonderful!! Thanks for sharing the great pictures of the process you used on these small boats.
Uwek Administrator Staff member Administrator Forum Moderator Joined Dec 25, 2017 Messages 31,254 Points 1,238 Location Vienna, Austria Yesterday at 2:30 AM #475 Bravo - very good work on these boats - I like them very much are you finished with boat-building, or do you plan more for your 64-gunner?
Bravo - very good work on these boats - I like them very much are you finished with boat-building, or do you plan more for your 64-gunner?