The Frames Continuation:
The first gunport frame was installed with the frames, I thought it would save some time, but it took longer than cutting in the ports after the frames are installed. I will make the cutouts for the remaining gun and sweep ports after the frames are installed.
IMG_2847.JPGIMG_2852.JPGIMG_2853.JPGIMG_2854.JPGIMG_2855.JPGIMG_2856.JPGIMG_2857.JPGIMG_2857.JPG
 

Attachments

Mike41

Blandford
Staff member
Blandford Group Build
Joined
Aug 10, 2017
Messages
1,042
Points
383

The Frames Continuation:
The frames are all built and ready to be installed on the keel. This is a couple of progress photos showing the current status of the model. They should be installed this week.
IMG_2875.JPGIMG_2876.JPG
 

donfarr

Well-Known Member
Joined
Jan 9, 2013
Messages
2,515
Points
528

WAY TO GO DOC,,,,,,MIKE IT LOOKS FANTASTIC< HATE TO ASK ANY TIME FRAME FOR THIS COMING OUT> Don
 

donfarr

Well-Known Member
Joined
Jan 9, 2013
Messages
2,515
Points
528

HI DOC, HAVE A GOOD VACATION ENJOY, IT WILL PROBALLY TAKE MUCH TO LONG LOL> Don
 

Mike41

Blandford
Staff member
Blandford Group Build
Joined
Aug 10, 2017
Messages
1,042
Points
383

The Frames Continuation:

Well it took a little over a week to install the frames, but this has been a busy month for everyone. I did not pre-bevel the frames, Tso I spent a couple of days sanding out the rough spots lol. The keelson is installed, and the bottom timbers will be installed next. This is the progress photos of the model.
IMG_2889.JPGIMG_2891.JPGIMG_2892.JPGIMG_2895.JPGIMG_2898.JPGIMG_2899.JPG
 