Pawley's Blandford Cross Section Project 1:32 Build Log

Pawley

Well-Known Member
Joined
Oct 19, 2018
Messages
25
Points
68

Location
Pawley's Island, SC
I'm up to Frame 3 now and working on Frame 4. So far I have just dry fitted the three frames to the build board. They are looking okay so far. I did use the pencil lead method to place bolts/treenails as shown in the below photo.


88190

88191

The bolts/treenails appear to look good to me. A lot of times it is better to see things like this in a photo rather looking at them sitting on the bench. Unless there is a reason not to, I'll continue using the pencil lead method on the frames. May change with other bolts and treenails.
 

Pawley

Well-Known Member
Joined
Oct 19, 2018
Messages
25
Points
68

Location
Pawley's Island, SC
I've got four frames dry fitted and Frame 5 ready to glue up.


88766

Still got work to do but I'm getting there. Got to go out of town tomorrow so work will be delayed until the day after. I am setting my goal to get all 9 frames cut and glued up this week. However, you know how goals can be. I am trying to go slow and not get too anxious because that is when I make mistakes that have to be corrected.
 
Top