I have completed the running rig and labelled all the lines. My next step is to attached the lines to the various belay pin locations. Is there a sequence to follow in attaching the lines?
Do the inside pin racks first and then the outer or start from the top of the mast and work my way down. During my last model ship I ran into problems in keeping all the lines taut.
Do the inside pin racks first and then the outer or start from the top of the mast and work my way down. During my last model ship I ran into problems in keeping all the lines taut.