SEGUIN TUGBOAT - About to Plank ...

Joined
Jun 19, 2022
Messages
8
Points
18

All frames/stringers faired.
Next, in this Bluejacket kit, plank the Garboard(s). Followed by rest of hull plankng, to sheer (done frame/hull upside down).
Looking for any encouragement here, since I've never done scale planking (tapered, steelers, etc.).
I like challenges, really need "jump start" .20230214_104058.jpg20230214_104415.jpg20230214_104258.jpg
 
looking good so far. Be careful not to break off any of the small posts, other build logs warn of this and I still managed to snap two of them.
Work with a planking fan and do your calculations. GO SLOW remove a small amount at a time and dry fit first.
Go for it!
 
All frames/stringers faired.
Next, in this Bluejacket kit, plank the Garboard(s). Followed by rest of hull plankng, to sheer (done frame/hull upside down).
Looking for any encouragement here, since I've never done scale planking (tapered, steelers, etc.).
I like challenges, really need "jump start" .
Hallo @RamzTugs
we wish you all the BEST and a HAPPY BIRTHDAY
Birthday-Cake
 
Back
Top