The update for week 12-2026.
Thanks for the likes and your comments.
Over the past week, I have been busy with the topgallant shrouds on both sides.
And with installing the main topmast stay. (the Batavia does not have a preventer stay according to the manual)
For the latter, I had previously placed the loop around the foremast, attached a single block to it, and then the tackle to that.
( 2 photos from early August 2025. Different quality

)
With sufficient length, which has now been used to guide the stay via a double block and a single block above the topmast of the foremast to the top of the main topgallant shrouds.
Naturally, via a loop with a mouse. The tackle is secured to the middle pin of the foremast pin rail. (I do not know the English name)
Continuing with the main topgallant shrouds. First, I tensioned all the tackles of the deadeye blocks and secured them with seizings.
Then, I started on the ratlines on the starboard side.
The photos shows the state as of this morning.
The piece of paper ensures that I only see the ratlines and the shrouds.
Otherwise, it gets very crowded behind them.
The coming week will probably consist entirely of attaching the ratlines and installing the two futtock staves for the topgallant shrouds.
Have a great building week, everyone.