At the beginning, the keel and ribs were made of cherry wood, and at that time, the purpose of this work was still to serve as a validation model for Kit production.
When I reached the fifth section, my production goal changed and I wanted to use her to participate in some model competitions. Therefore, I added a lot of details to the content of the fifth section, far exceeding the details of a regular kit
I replaced the wood with yellow pear wood, and its color is really amazing. It's my favorite color
There are two types of drainage pipes, one is a circular pipe with a diameter of 1.5, and the other is a square pipe with a large drainage capacity of 2X2mm
At present, I produce some content every day and am very fascinated by the current situation. I think I might accidentally complete this work, but I still need to stop and write instructions and production for the fifth section
The later content will be even more exciting