• LUCZORAMA SHIPWRECK SCAVENGER HUNT GIVEAWAY. 4 Weeks of Fun • 1 Legendary Prize ((OcCre’s Fram Ship)) • Global Crew Welcome!
    **VIEW THREAD HERE**

Help with TEMPORARY bulkheads in the Donald David, a Maine Lobster Boat.

Joined
May 15, 2019
Messages
323
Points
168

Location
United States, Neenah, WI
I need advise for a practical method to hold the molds in place until the frames are bent into place and the planking is done. I'm guessing that some type of glue will work, but I want to be sure that I can remove the bulkheads without damaging the keel, or other parts. The keel is white oak, 3/8" wide and 25 1/2" long from stern to forward perpendicular. The bulkheads are 1/8" plywood. Drawings of the bulkheads are in my scratch-build log for the Donald David.
Any suggestions are greatly appreciated.
Steven :)
 
Back
Top