This was my first kit ever. There were some bumps in the road as with any first of anything. But key was learning from those bumps. Time was 175 hrs or work over the course of 3 months.
At this point I was short on second layer of planks so had to wait till occre sent some extras. They were very fast with their service. So in the time being I started to work on other aspects of the ship.
At this point I was short on second layer of planks so had to wait till occre sent some extras. They were very fast with their service. So in the time being I started to work on other aspects of the ship.