- Joined
- Jan 10, 2022
- Messages
- 701
- Points
- 403

Hi All. A new year, a new project, CAF Model's 1:48 scale HMS GRANADO, full hull PoF kit. Just about everyone is now familiar with this kit due to the great reviews and build logs already existing on the S.o.S. site, but for those not, before l get into the build proper, l would like to do a quick introduction to myself and this amazing kit. Up to now this would be my third plank on frame kit. Modelship Dockyard's HMS Blandford being the first, followed by HMS Alert produced by Trident Model, which l have recently completed. Both kits were superb and great fun to build and have firmly set me on the POF path, which is why l'm so excited about this project. The kit comes in 3 separate parts or sessions, which are all available to be purchased individually. l have all 3 and can say that this looks to be, probably, the most amazing kit l have or will ever attempt to build. l have always liked to study the plans/drawings, instructions and the parts themselves of a kit before starting to make sure all is complete and l understand the instructions and method of construction. Looking through the contents of part 1, the quality of the wood (cherry) is excellent. Mostly laser cut, with a few CNC milled sheets which go to make up the keel and frames structure of the hull of this ship. The instructions come in the form of a beautifully produced booklet, in understandable English with detailed colour 3D drawings of each step of construction. Very impressive. A cleverly designed high quality 4 mm plywood building jig is also included in this first session. A small project in itself, it is essential to keep the frames square to the keel and accurately place each individual frame to make up the hull. Talking of which, this kit is designed in such a way that you have the option of making the hull a split structure, separating the top from the bottom, enabling the highly detailed interior to be viewed in all it's glory. A great idea, but l have already decided to make my kit as a standard, one-part construction. This is just the first step of what promises to be a long and rewarding project. l can't wait to get started and look forward your company. Any tips and ideas would be greatly appreciated

















