• Win a Free Custom Engraved Brass Coin!!!
    As a way to introduce our brass coins to the community, we will raffle off a free coin during the month of August. Follow link ABOVE for instructions for entering.

Building the Endurance

  • Thread starter Thread starter Omega
  • Start date Start date
  • Watchers Watchers 1
Joined
May 20, 2024
Messages
79
Points
88

Starting a new Build log for the Endurance. I Know that several others are also building this ship and of course I will be cheching their builds to help with mine (thank you). But first a little info as to my reason for building these ships :-
1. I like doing it!
2. When finished I send them to my Grandson in a City 3,000 km away. I have already done this once with the Harvey build with no problems. It is all on how you box & pack the ships, (Perth to Melbourne)
3. I am getting older than I though I would get, so I need something to keep the Brain Active
 
Starting Slowly, I intend to make some additions to the kit (a least try to). I want to install a streering mechanism so the ships wheel actually works & I want to light the internal areas of the ship using LED lights. I had some internal problams with power supply to lights on the ship until I discovered the solution in another build log - An extrernal powers source (batteries) with power feed to the ship through the ship stand.( and the Keel). Well Here we go

End 01.jpg

End 02.jpg
 
Last edited:
Photos are coming in upside down again ??????. you should note I have drilled a hole from the rudder post to the rear deck so the rudder can be controlled. I also reinforced the section in this area
 
First putting glass in the porthole all 32 of them. The colour will actually turn transperant - works well

Endurance 01.jpg
 
Having sorted out where the electricals will go, I have now started to put the hull together completed the decking so that is only in position to fix the frame positions Opps - upside down again, I not sure why this keep happening - Perhaps someone can tell me what I am doing wrong seems to only happen with JEPGS Deleted JPEG and uploaded PGN

Endurance 02.png
 
Last edited:
Wiring, installing & testing the internal lighting. A bit more fiddly than I expected, but so far so good, you might note I have left a wiring attachment to wire in running lights on the masts

Endurance 03.jpg

Endurance 04.jpg
 
Progress is slow but is getting there. wiring within the hull complete and building the hull. planking to start and then there will be no access to hull interior

Endurance 06.png
 
Back
Top