- Joined
- Aug 16, 2019
- Messages
- 870
- Points
- 343
Nice weather I am starting to paint the hull outside long process
So between coating and waiting to the paint to dry I will build the davits and the winches
The davits are compose of 4 pieces and the winches 13
24 life boats = 2 supports per boat 1 winches for 4 supports place between each assembly
All the parts came in 10 instalments 23-1
23-2, 23-3 all the parts for the davits
To put the 3 parts necessary to build 1 support the part mist align themselves with 2 hole 0.4mm that will be use later to let pass a wire 23-4
So I build myself a gig 23-5 using my vice a double side tape and 2 small bits 0.35mm at the proper space 23-5 using a drop of CA glue I build the support 23-6, 23-7
48 assembly 23-8, 28-9 to that I add the rail platform port side and starboard 23-10
The complete assembly 23-11
The part for the winches 23-12
1 winches complete 23-13 all 12 of them build 23-14
An idea of the size 23-15
48 support and 12 winches 23-16
So between coating and waiting to the paint to dry I will build the davits and the winches
The davits are compose of 4 pieces and the winches 13
24 life boats = 2 supports per boat 1 winches for 4 supports place between each assembly
All the parts came in 10 instalments 23-1
23-2, 23-3 all the parts for the davits
To put the 3 parts necessary to build 1 support the part mist align themselves with 2 hole 0.4mm that will be use later to let pass a wire 23-4
So I build myself a gig 23-5 using my vice a double side tape and 2 small bits 0.35mm at the proper space 23-5 using a drop of CA glue I build the support 23-6, 23-7
48 assembly 23-8, 28-9 to that I add the rail platform port side and starboard 23-10
The complete assembly 23-11
The part for the winches 23-12
1 winches complete 23-13 all 12 of them build 23-14
An idea of the size 23-15
48 support and 12 winches 23-16