Good morning. We have had our first winter rain here in Cape Town and that means some shipyard time.
Some work on the cannons - Fixing trunnions and placing the
View attachment 594989View attachment 594990
The maple bulkwalk planks have bugged me since I layed them. The kit (and real ship) had these painted red so I get why these were maple. I am not painting my ship other than some black and the look and feel of the “white” maple never made me happy.
So…..I cut some 5mm cherry veneer planks and redid them……soooooo much better.
View attachment 594992
View attachment 595010
I also decide to add one row of the diminishing planks below the wales. These should be in the top butt pattern however I only want one row not two so stuck with a regular single row……hmmm more like I was too lazy to attempt hand cutting these again

. I also chose not to bend these at the stern around to the deck transom - I want this section open.
Here is where she sits right now. I have so much finishing to do as I found cherry wood darkens very quickly and my final sanding must be done right before I oil her. I am very encouraged so far……..let see
View attachment 595006View attachment 595007View attachment 595008View attachment 595009
OH- nearly finished the treenails above the wales

.
Cheers Grant
View attachment 594991