- Joined
- Jun 1, 2026
- Messages
- 5
- Points
- 23

![]() |
The beloved Ships in Scale Magazine is back and charting a new course for 2026! Discover new skills, new techniques, and new inspirations in every issue. NOTE THAT OUR NEXT ISSUE WILL BE July/August 2026 |
![]() |
![]() |
As a way to introduce our brass coins to the community, we will raffle off a free coin during the month of August. Follow link ABOVE for instructions for entering. |
![]() |


thanks Mike I appreciate it!Welcome Max to the forums and greetings from Texas! Magic Mike





I appreciate a lot your suggestion Allan, you are right I did several mistakes in the lower bridge construction due my amateur lack of experience, I still studying and try to improve from mistakes, Il try to figure it out how to fix gratings in lower bridge BTW for sure I'll do better on the construction of upper deck.If they are not already glued in place, it is not too late to change the gratings. The gratings in the photos have the battens running athwartships and the ledges fore and aft. They should have the battens running fore and aft and ledges athwartships. The top of the gratings lays flush with the head ledges and coamings otherwise create a tripping hazard., It may be too late, but for the future....
Allan
View attachment 627823
View attachment 627824
View attachment 627825

