im trying too find out were 2 start and were 2 finish A72 rope , as you can see the picture looks like 1 mess . hope theres help here i have add 2 pic.View attachment 132791
G'day Arntos, the rope is attached to the hull with an eye bolt, it then goes up through the block 26 back down through block 24 ( which is attached to the hull with a three legged Fixture ) then it goes through the hull and is tied off to a cleat, hope this helps you,
Best regards John,