Ahoy!... Moving aft pics. I have the main cabin in place, and starting on the 3rd cabin rough in. I had to raisebothe structures appox 3 mm to match the drawings. And the pump.....well.. it is installed with the main pin rail, but it may need some tweaking, as I have no idea how the pump piston/cylinders enter the decking, and the handles were missing from the kit, I can fashion some from wood....I had hoped that the vendor would be mindful of the belay pin size supplied to drawing specs. Pins supplied to drawing specs are waaay off.