20210611
Started work on the Muscongus Bay Lobster Smack (Model Shipways 1:24) 2 weeks ago. Work schedule kept me from the model the past few days and so I’m just now doing the first post on the build.
So far things are going well (translation: so far I’ve only broken two thin parts that needed to be glued back together). A bit of sanding required a couple of times when things don’t exactly line up properly but I’ve come to expect that – dry fit, sand, dry fit again, glue, sand. Slowly things are taking shape.
More sanding in the works as the frames need fairing before building continues.
It’ll be a couple of weeks before I post again as summer is upon us and it’s time to take a bit of vacation.













Started work on the Muscongus Bay Lobster Smack (Model Shipways 1:24) 2 weeks ago. Work schedule kept me from the model the past few days and so I’m just now doing the first post on the build.
So far things are going well (translation: so far I’ve only broken two thin parts that needed to be glued back together). A bit of sanding required a couple of times when things don’t exactly line up properly but I’ve come to expect that – dry fit, sand, dry fit again, glue, sand. Slowly things are taking shape.
More sanding in the works as the frames need fairing before building continues.
It’ll be a couple of weeks before I post again as summer is upon us and it’s time to take a bit of vacation.