Here is a pic of the reverse rigging installed over one section of the belaying pins. These lines have been cut to the appropriate length as detailed in the instructions, tied and numbered for future reference. When called for in the build, these lines are pulled up through the mast heads, blocks , and eventually tied off high above the deck where things are just more open and conveniently accessible.