• Win a Free Custom Engraved Brass Coin!!!
    As a way to introduce our brass coins to the community, we will raffle off a free coin during the month of August. Follow link ABOVE for instructions for entering.

USS Constitution 1:70 Scratch

I turned back to the fighting tops. The tops were painted gray and the bottoms white. The strip surrounding the top was soaked in boiling water for about 10 minutes and then held in place with clamps. Once dry, it was removed and, after being painted white, glued back in place.

I finished today by installing the deadeyes that I had previously prepared for the top mast shrouds.

20251017_132945.jpg

20251017_133638.jpg

20251018_101029.jpg

20251019_124448.jpg

20251019_143837.jpg

20251019_143808.jpg

20251019_144759.jpg
 
Thumb cleats, blocks with sheaves inside them, and bolsters were fabricated and fitted to the trestle trees today. As I always do, I drilled a small hole and a shallow channel to represent the sheaves.

Once these fittings were in place, the main and fore trestle trees were glued to their respective masts. The platforms, however, have not yet been glued, they will remain separate until the shrouds are completed.

20251029_082447.jpg

20251029_082539.jpg

20251029_082626.jpg

20251029_122635.jpg

20251029_122630.jpg

20251030_140242.jpg

20251030_140237.jpg

20251029_123536.jpg

20251029_124209.jpg

20251029_123726.jpg
 
Last edited:
Before attaching the shrouds, I decided to make and install the hammock net frames. Once assembled, they will be painted black. The frames on the actual ship are made of square-section forged iron, but since I don't have square-section brass wire, I am making them from 0.55mm round brass wire.There will be 54 of these made, and they all have to be the same shape and size. I'm using jigs to make them.

1.jpg

2.jpg

3.jpg

5.jpg

6.jpg

20251102_131949.jpg

20251102_132104.jpg
 
Last edited:
Now it's time to start rigging. There's no particular reason, but I'm starting with the main mast. I think it's just a matter of habit; I always start with the main mast, then work on the fore and mizzen. The main mast has now been set in place and glued securely. The pendants need to be prepared and hung before the shrouds. I didn't use thimbles for the pendants; I simply created a loop and stiffened it with CA. By the way, I didn't make the pendants as shown in the plans. If you compare them to the plans, you'll see what I mean. I chose a simpler method because they would be hidden under the shrouds and wouldn't be visible.

When seizing the areas where the pendants are wrapped around the mast, I use the serving machine I made.

Let me state now that I will not be adding the sails and therefore some of the ropes.

14.jpg

15.jpg

16.jpg

18.jpg

19.jpg

12.jpg

13.jpg
 
Last edited:
Back
Top