Currently I’m testing this method.
A smaller version worked very well for soaking the planks for my Enterprise build.
The bottom cap is sealed and glued on with Gorilla Rubber Cement, the top cap is removable and forces the soaking items down into the tube. Without that cap the buoyancy of the pieces to be soaked extends them a third of the way out of the tube.
Currently the Garboard pieces are soaking. The plan is to bend and attach them to the hull frame tomorrow.
A smaller version worked very well for soaking the planks for my Enterprise build.
The bottom cap is sealed and glued on with Gorilla Rubber Cement, the top cap is removable and forces the soaking items down into the tube. Without that cap the buoyancy of the pieces to be soaked extends them a third of the way out of the tube.
Currently the Garboard pieces are soaking. The plan is to bend and attach them to the hull frame tomorrow.