Davits

Joined
Aug 4, 2020
Messages
5
Points
1

Building OCCRE’s Endurance and need to tie off the ropes from the pulleys of the life boats. Directions seem to show they are tied off at the base of the davits. Is this the correct way or should they be tied off at the rail?
 
The best three photos I could find are below and not very conclusive although the last one of Sir Ernest Shackleton waving from aboard the Endurance at Millwall Docks seems to have the rope belayed on other than the davit itself.
Allan

1745863561445.png
1745863592730.jpeg
1745863629648.jpeg
 
I think deadeye will be connected to the crane first and then after connecting it to the deadeye, it will be passed through the deadeye eyes.
 
Back
Top