- Joined
- Aug 4, 2020
- Messages
- 5
- Points
- 1

Building OCCRE’s Endurance and need to tie off the ropes from the pulleys of the life boats. Directions seem to show they are tied off at the base of the davits. Is this the correct way or should they be tied off at the rail?