Egyptian Seagoing Ship “Byblos” - 1:32 [COMPLETED BUILD]

This is just the kind of thing I was talking about in another thread. This is an amazing build, and one I will follow with great interest.Ancient ship building techniques were so interesting in the way that they solved problems. And from what I see here in this thread, it seems that the problems need to be solved in the same way today. Keep up the beautiful work!
 
I want to give an update......

Let’s keep in mind this “famous” picture....

6A7BE102-71C3-4A37-AF93-DC037704BE19.jpeg

It is time to start with the central beam or girder .... according with the investigation this is the equivalent to the keel. It is its predecessor..... it was among the Hugging-Truss, the elements that kept the hull with this form and gave to it the strength.....

In this case, the beam was convex and in order to give it the right form I needed to tie it up to the hull. Thanks to God I had a lot of holes to do it.... :)

0E3A204B-6F92-4ED7-9D23-0DACFE4671CA.jpeg

I did it before the deck beams. It gave me the “exact” position for them.....

16A174F2-931F-413C-A063-03B18F095AAE.jpeg
D434A0C7-56CC-4902-9E98-3FADDC05CB82.jpeg


They have a little holes in both ends, that is the way they wil be tied to the hull.....

EB1E46D1-5E81-449E-85BD-82A840951B91.jpeg

Also the Bow-Stern “poles are made..... I choose different wood in order to “kill” a little bit the monotony.....

CAD61EDD-91FC-4D29-A0F4-64885F3929D2.jpeg

Let’s put some other elements.......

D1D0BA70-C559-4D72-AFBD-23D6A2158A57.jpeg
 
Let’s keep going....

The little “columns” that fix the girder to the hull through the frames are in place...

17D274AD-E012-475B-9C77-B9C8EEB1B735.jpeg
7AD57522-6EDA-4097-891C-1A11CBA6B332.jpeg
6BAF7280-78EA-49C5-B4CE-16DBA57E37C8.jpeg


The poles for the hugging-truss and mast raising system are in place...


I started to fix the beams to the hull...... they are supported by the girder and tied to the hull....

93819E0F-0351-49B0-A209-BFEA6699E12B.jpeg
D351C08E-6825-479C-AA2C-0FFD8FD5B458.jpeg


We are going to install first these beams.....they are the “end” of each deck section....

D7E98CA3-6458-40FE-9912-0491E701AC14.jpeg

Same thing with the bow pole with the “eye of Horus” .......

39DA75CA-9A29-4513-A68F-C0EAD6F684B2.jpeg
 
Hello all.....

My advances so far......

I’ve been working in the deck. In the central zone, I will leave the hull half open in order to allow all the sewing been seeing, they will be removable .....

D39E1C8E-DC08-4914-9EE6-44503C0DDD5A.jpeg
It is sewed also.... at the same time I’ve working in the bow and stern deck but these are just “presented” since I need to work in the external hull, finish the hull sewing....

A5B4B8EE-02BB-4D3E-A904-CA7A51B96983.jpeg

And then they will be fixed/sewed.

Take look how it is looking so far......

953BEEDE-DF31-43B3-B66B-39063A3664E3.jpeg
69E4172A-03D0-4534-8057-3B669CF11F16.jpeg
3A3E3AA8-4235-4488-9E21-7BFDC58ADA6B.jpeg8C9B3047-4591-4021-95CC-544B4CEC6742.jpegD605252C-9AD4-4326-B113-C39E4E798443.jpeg
 