First Build: Black Prince (1775) Colonial Schooner - Mamoli - 1:57 - Double Plank on Bulkhead

Peak halliards for both masts are all rigged, along with the throat halliards. As I said before I was experimenting with some different rigging methods, especially for the peak halliards. Close ups of both methods are shown here.

20191111_223132-jpg.157908


View attachment 157909View attachment 157910

Peak and throat halliards and the boom topping lift all set. Decided to go with a single topping lift on the main.View attachment 157907
Newbie here love your build log, what keept the goodseneck attched to the mast please?
 
Back
Top