WELL DONE, AND YES IT CAN NOT BE SEEN.I decided to try my hand at serving the lower shroud lanyards. It came out much better than I thought it would. Although I doubt anyone will see this detail....I know it's there and it gives me a warm fuzzy.
View attachment 339667View attachment 339668View attachment 339669View attachment 339668
I feel your pain. 1500 clove hitches in 45 days on my Soleil Royal.
TO ME IT LOOKS GOOD. Only to clear up, there is no Backstay on the Bowsprit. Backstays are only from the Main mast. I have about 1000 images about standing and running riggen in uK and ES.Lower mizzen ratlines finished without too much sweat. Next will be fabrication of the lower main so I can finish the standing rigging for the mizzen, then the lower fore mast....etc.
I also finally got my supply of deadeyes so I added the back stays (correct nomenclature??) For the bowsprit.
View attachment 340230View attachment 340231View attachment 340232
View attachment 340233
I feel your pain. 1500 clove hitches in 45 days
TO ME IT LOOKS GOOD. Only to clear up, there is no Backstay on the Bowsprit. Backstays are only from the Main mast. I have about 1000 images about standing and running riggen in uK and ES.
View attachment 340251
View attachment 340259
View attachment 340260
View attachment 340263
View attachment 340264
THAT IS BETTER. EL CAPIBobstays, that's it!
Yep my favoriteI feel your pain. 1500 clove hitches in 45 days on my Soleil Royal.
Did that include ratlines? Impressive.Mainmast lower shrouds and ratlines installed. Despite the mainmast being the tallest mast with the most shrouds I got er done in 1 1/2 days of work. I just shut my brain off.
View attachment 359155View attachment 359157
View attachment 359156
View attachment 359158
Nice. I can only do about 6 ratlines on a side before taking a break to do something different.Mainmast lower shrouds and ratlines installed. Despite the mainmast being the tallest mast with the most shrouds I got er done in 1 1/2 days of work. I just shut my brain off.
View attachment 359155View attachment 359157
View attachment 359156
View attachment 359158
Is a nice build generally. I do not like myself the way you have faster the shroud to the mast. first one on each side, then the rest in pairs. each not around the mast will take a step backword. not to criticise but to have in mind for next time- I know that I am to old -both in age 80 and of building 50 years.Mainmast lower shrouds and ratlines installed. Despite the mainmast being the tallest mast with the most shrouds I got er done in 1 1/2 days of work. I just shut my brain off.
View attachment 359155View attachment 359157
View attachment 359156
View attachment 359158
Yup, 336 clove-hitches for both port and starboard.Did that include ratlines? Impressive.