No hardly, I am just getting back to this hobby after a decade hiatus, (the entire Montanes build log up to yesterday was from 2004 with digital photos dated from 2014). One kit at a time, I am looking forward to the activity ASAP with the speed that is required for each kit.
I plan on concentrating on the Montanes for now until its completed; followed by the Sao Miguel in a in a few months time or so. Then onto the continuation of the Wappen von Hamburg until finished. I estimate that completing those two kits will take me into late 2027 or so. Then I have planned the builds for the OcCre Nuestra Senora del Pilar, Corel Berlin, and Mamoli Royal Louis, in no particulare order, starting the 3rd or 4th quarter of 2027. Maybe I will try do all three at the same time if I get my in-house hobby shop completed by then which has more space (12 x 24 feet vs the current grage shop of 6 x 10 foot). I will have the space to have two or three work tables / benches available to enable me to work on two or three kits at the same time.
I won't get to the Royal William for quite some time yet, it is a very scary model with a few scratch-built parts for a newbie like me who only has completed five models since 1976. Those photos for this build were taken just the day I posted it.
I just did a little work on those three kits; Sao Miguel, Wappen von Hamburg, and Royal William when I first received those kits in 2004 through 2010, just had to fit the bulkheads to the false keel, and continued until, well you can see the postings. I just HAD to post them, like a teaser, getting my muse fueled up for building once again, and BTW those photos were all from 2014 cloud storage also.
Try to build a day for 8 hours, photos for 30 minutes or so, write up the commentaries for the days activity and post to MSW and Ships of Scale.
Whew, lots of writing, hope it wasn't too much for you. Your interest keeps the old brain working. Thank you.