G'day everyone
The lounge room is almost done. This room is the hardest room in our house to do because of all the extra work that has to be done.
The wall and ceilings have been painted, the floor that been layed. I'm a bit frustrated with myself on this stage, as I took me 4 days to complete. I'm so slow compare to before Parkinson's, it unbelievable.
My wife and I decided that we need extra power points in the lounge room instead of running extension leads.
I installed 4 extra power points and moved one and the TV's outlet to a different wall. To do this, I cut away plaster boards to run the wires etc. and after all the points were in the correct spot, I replastered the walls. This took me 3 days, again I was slow.9
Then my wife had the great idea to put the tv on the wall, so I have to run cables behind the plaster. Also she said why don't we have a feature wall behind the tv.
This wasn't too long but another 2 day were taken up. The window frames around the 3 windows took 2 more days, as the position of each window was not uniform and the sizes were all over the place.
This was the lounge Room before starting.
After this room is done, we will having a break till after the New Year.
I'm hoping to get back to my RC for a short time.