For sure I enjoy the build on the inside, Daniel. It’s looking very nice.Hello everyone, continuing on with the lower section of this build I installed the mast bases and began the lower cross beam installation.
You can see I am stain/sealing as I am coming up from the keelson. At first, I couldn't find what happens to rib #31 with the two 2mm dia. holes just aft of the main mast base support but hiding in plain sight they are the anchor holes for two bollard supports that come all the way up through the main deck.
View attachment 373626View attachment 373627View attachment 373628
Well, these macro shots sure show a lot of imperfections you wouldn't see at a normal observing distance. I suppose we all have to deal with this on occasion.
Hope you enjoy.
And Dean is correct, the 2 holes are for the waterpumps.
Regards, Peter