- Joined
- Jan 26, 2017
- Messages
- 1,379
- Points
- 493

The mizzen royal and topgallant yard braces are now rigged. There are no blocks on these yards for the braces. The standing ends are secured to the ends of the respective yards, while the running ends pass through double blocks previously attached to the aft side of the main topmast trestletrees. From there, the brace lines run down to deck level and are belayed to the pins on the main fife rail.










