- Joined
- Oct 1, 2023
- Messages
- 1,064
- Points
- 393
I used an 8mm drill bit.Unsure what size to make the uppers.
Thank you.Just catching up on your build log Ted. You are making great progress.
Perhaps this will help you:I can't find the mast hoops in the Instruction book. How many do I make for each top mast?
I'm making extras and selecting those that come out the best. I had 12 extras on the lowers.
This has turned out to be one of the more enjoyable parts of my build.
Happy modeling
Ted
Thank you
Thank you Daniel.The stove pipe looks to be correct the windlass motor box looks like it needs to go towards the bow approx. 5mm maybe 6mm.
View attachment 474805View attachment 474806
Notice the aft end of my box is 3 or 4mm forward of the stove pipe. I have a gear coming out of my box that meshes with the main gear of the windlass.
Thank you. I've already made a replacement. Drilling it just now for the bolts.Actually Ted, the bowsprit doesn't start from the bits fwd, the bits being the two posts, adjacent to the holes for the anchor davits, but from the Samson post, immediately fwd of the winch.
(While I slightly modified the bowsprit itself, the installation is pretty much as YQ prescribed.)
Maybe it's beneficial to compare YQ's drawings with your bowsprit install.
View attachment 474885