The update for week 14-2026.
Wishing everyone a Happy Easter. (Here in Greece, Easter is next weekend this time)
Thanks for the likes and your comments.
Continued working on the main topgallant shrouds on the port side.
This is now also finished, including the futtock stave.
Also started on the main backstays, 2 of which are now attached and tensioned. However, not all seizing are on yet.
In the meantime, I also started "re-installing" blocks on the stays.
Initially, two were already mounted on the main stay, but I later noticed on another drawing that the rope starts at the block.
That is why I redid this. Starting with the mainmast. So, for each side.
And instead of one single block (drawing 6), I made one double block (drawing 8).
Without sails, one single block is probably enough there.
Because the rope starts at the block, I immediately attached 70cm of rope to it, which later runs back to the block via a fiddle block on the yard and then to the deck to be secured. If I am correct.
And just made a roll and attached it to the shroud.
Next week I will continue with the Backstays.
Probably attach some blocks as well, since I can still easily reach them now.
Have a great building week everyone.