• Win a Free Custom Engraved Brass Coin!!!
    As a way to introduce our brass coins to the community, we will raffle off a free coin during the month of August. Follow link ABOVE for instructions for entering.
  • SUBSCRIBE TO SHIPS IN SCALE TODAY!

    The beloved Ships in Scale Magazine is back and charting a new course for 2026!
    Discover new skills, new techniques, and new inspirations in every issue.

    NOTE THAT OUR NEXT ISSUE WILL BE MARCH/APRIL 2026

Batavia 1628 (1:72) Kolderstok Build log

The update for week 17-2026.

Over the past week, I have mainly been busy with the Fore Topmast Shrouds and preparations for the Fore Topmast Stay.
I also installed a section on the Mainmast, Main Topgallant, where the Main Topgallant Shrouds will go.
Pictures often speak better/more than words, so I will do the same here. ;)

20260426_001.jpg 20260426_002.jpg

All shrouds are around the Fore Topmast, 4 pairs, fitted with deadeyes, and all 8 are tensioned but not yet definitively.

20260426_003.jpg 20260426_004.jpg

And the preparations for the Fore Topmast Stay. The parts and 2 single blocks thereof on the bowsprit later.

20260426_005.jpg 20260426_006.jpg

After all the ropes of the Fore Topmast Shrouds were tensioned, I could start placing the ratlines again.

20260426_007.jpg 20260426_008.jpg

The coming week will be all about these 2 Fore Topmast Shrouds. And maybe installing the Fore Topmast Stay.
Who knows. :)

Until the next update and wishing you a great building week. Thumbsup
 
The update for week 18-2026.

Thanks again to everyone for the likes.

I kept myself busy with the 2 Fore Topmast Shrouds this past week. I can report that they are finished.

20260503_001.jpg 20260503_002.jpg

The foretopmast stay has also been installed. With a detail of the connection on the bowsprit. (According to the drawing)
On the port side, this runs along the sprit mast backstay.

20260503_003.jpg 20260503_004.jpg

There are also two sets of 3-1 blocks mounted on the bowsprit for guiding the bowlines of the fore-topsail and the fore-topgallant sail.
These all run from above these blocks via a 3-1 block on the two stays above them. But more on that later in the process.

20260503_005.jpg

My next steps involve installing the 4 Fore Backstays.
I will probably also start mounting the main topgallant shrouds.

Until the next update and wishing you a pleasant building week.Thumbsup
 
Back
Top