Bill-R Joined May 4, 2022 Messages 783 Points 308 Location Tallahassee, FL Jul 17, 2022 #741 Hello Christian, Beautiful work. I look forward to your post to see your progress. Bill
WojtasS Joined Jan 21, 2022 Messages 684 Points 353 Jul 17, 2022 #742 Your experience at this stage of build will be very helpfull. I'm looking forward to your thoughts on this matter
Your experience at this stage of build will be very helpfull. I'm looking forward to your thoughts on this matter
CRI-CRI Joined Feb 17, 2021 Messages 1,054 Points 493 Location Strasbourg (France) Jul 18, 2022 #743 Eight beams and clamps glued :
CRI-CRI Joined Feb 17, 2021 Messages 1,054 Points 493 Location Strasbourg (France) Jul 18, 2022 #744 I found the time for adding some other beams (at 17:00 PM, we got a fine weather, with blue sky and only 40° C) ;
I found the time for adding some other beams (at 17:00 PM, we got a fine weather, with blue sky and only 40° C) ;
CRI-CRI Joined Feb 17, 2021 Messages 1,054 Points 493 Location Strasbourg (France) Jul 19, 2022 #745 The front part of the upper deck is now finished with glued beams after the drawing frame :
CRI-CRI Joined Feb 17, 2021 Messages 1,054 Points 493 Location Strasbourg (France) Jul 21, 2022 #746 Look about the frames of the upper deck, half number of beams are installed and glued : By a mysterious chance, it seems that there is no visible symmetry or geometrical default
Look about the frames of the upper deck, half number of beams are installed and glued : By a mysterious chance, it seems that there is no visible symmetry or geometrical default
CRI-CRI Joined Feb 17, 2021 Messages 1,054 Points 493 Location Strasbourg (France) Jul 23, 2022 #747 28/36 beams done :
CRI-CRI Joined Feb 17, 2021 Messages 1,054 Points 493 Location Strasbourg (France) Jul 24, 2022 #748 All beams now done and glued, round-aft and sheer seem right;, I'm happy, as said Droopy :
CRI-CRI Joined Feb 17, 2021 Messages 1,054 Points 493 Location Strasbourg (France) Jul 25, 2022 #749 This afternoon, I prepared the three masts partners, before covering the upper deck over the thirty-eight beams :
This afternoon, I prepared the three masts partners, before covering the upper deck over the thirty-eight beams :
CRI-CRI Joined Feb 17, 2021 Messages 1,054 Points 493 Location Strasbourg (France) Jul 26, 2022 #750 Precision alignment of the middle part of the upper deck (not glued) :
Bill-R Joined May 4, 2022 Messages 783 Points 308 Location Tallahassee, FL Jul 26, 2022 #751 Perfection in every detail. Bill
CRI-CRI Joined Feb 17, 2021 Messages 1,054 Points 493 Location Strasbourg (France) Jul 27, 2022 #752 Preview of the final position of the principal upper deck's gratings frames (not glued) :
CRI-CRI Joined Feb 17, 2021 Messages 1,054 Points 493 Location Strasbourg (France) Jul 27, 2022 #753 Evening pics with sunset enlightenment
CRI-CRI Joined Feb 17, 2021 Messages 1,054 Points 493 Location Strasbourg (France) Jul 30, 2022 #754 Our king Henri IV, was said "solide comme le pont neuf" : my deck Louis XIV is like grand father :
CRI-CRI Joined Feb 17, 2021 Messages 1,054 Points 493 Location Strasbourg (France) Jul 30, 2022 #755 Final result after gluing :
Bill-R Joined May 4, 2022 Messages 783 Points 308 Location Tallahassee, FL Jul 30, 2022 #756 Beautiful!
CRI-CRI Joined Feb 17, 2021 Messages 1,054 Points 493 Location Strasbourg (France) Jul 31, 2022 #757 Positioned pieces for mast's partners (not glued - a provisory taut wire visualizes the middle line of the vessel) :
Positioned pieces for mast's partners (not glued - a provisory taut wire visualizes the middle line of the vessel) :
CRI-CRI Joined Feb 17, 2021 Messages 1,054 Points 493 Location Strasbourg (France) Aug 1, 2022 #758 Beginning of planking the upper deck : ten about twenty four planks are positioned and glued :
CRI-CRI Joined Feb 17, 2021 Messages 1,054 Points 493 Location Strasbourg (France) Aug 6, 2022 #759 Upper deck done :
RDN1954 Joined Sep 3, 2021 Messages 4,800 Points 688 Aug 6, 2022 #760 For sure a becoming a beauty! My compliments.