12月21日,明天是东至了,中国南方讲究东至打过年,要全家团聚,今天更新进取的进度
尾横梁弧度打磨,厂家提供了模板,尾横梁安装固定,抽空给支架上色
尾部横梁完成,尾呆木完成,呆木和肋骨外部等下船台后统一打磨。
内龙骨完成,用0.6铜丝打钉
开始做内部甲板横梁支撑边条,生活甲板安装完成后发现整体弧度有问题,而且两边高度不水平,用木条补了一下,调整到水平
Google translation:
December 21st, tomorrow is the Eastern Solstice. Southern China pays attention to the Eastern Solstice to celebrate the New Year and reunite the whole family. Today we will update the progress of the progress.
The arc of the tail beam was polished. The manufacturer provided a template. The tail beam was installed and fixed. I took the time to paint the bracket.
The tail beam is completed, the tail wood is completed, and the wood and the outside of the ribs are polished together after getting off the slipway.
The inner keel is completed and nailed with 0.6 copper wire
I started to make the internal deck beam support side strips. After the installation of the living deck was completed, I found that there was a problem with the overall curvature, and the height on both sides was not level. I used wooden strips to make up for it and adjusted it to the level.