Wow, you got a manual? All I have is the PDF file. In step 99, it says the exterior planking is on sheets H3 through H9. The planks are numbered from the bottom to the top. The plank under most of the gun ports is plank 3. The planks have multiple pieces so plank 3 consists of 3.1 through 3.4. 3.1 is at the bow and 3.4 is at the stern. Then, below the above planks, in step 101 it says that the wales consist of 2 layers. "a" at the top down to "c" at the lowest level. "a" is a.1 through a.6. "b" is b.1 through b.5. "c" is c.1 through c.5 and "d" is d.1 through d.4. The first layer should be on sheets H3 through H9 and 1.5mm thick. Second layer at 1mm thick should be on sheets L1 and L2.
I hope that helps you my friend !!
LOL I'm a LONG way behind you on step 42.