Many Thanks for the kind comments and all the likes received.
Going further with the works on the sheerrails - this time the poopdeck at the bow
View attachment 393985
The outer epper plank was neded and installed - the kit sheerrail top is fitting very good from the form
View attachment 393984
View attachment 393991
Visible in the drawing is the fact, that the cathead is embedded inside so is deviding the top into two parts (see the laser marks on the part)
So before going further I had to make the cathead beam
View attachment 393986
and I had to make a notch in the inner and also outer plank
View attachment 393987
The necessary bolts (copper nails) are installed - these bolts are fixing the cathead down to the available beams and the top of the frame at the sheer rail
View attachment 393988
View attachment 393989
and the view from the outside
View attachment 393990
I have to go a little bit deeper.....the cathead beam has to lay flat on the planking
Many Thanks for your interest ..... to be continued ....