While I am awaiting my veneers to come in this week I am working on the inside of the two cabinets.
View attachment 46051
The lower shelf is fitted and the sides are covered with veneer. The cabinet will be filled with books. First I thought to fill one with china but for a ship which is rolling from time to time this is not a good idea. On the top you see the parts for the book shelfs.
View attachment 46052
This is the side view of the shelfs, in between the print of books will be fitted.
View attachment 46053
Dry fitting the empty book shelfs.
View attachment 46054
On internet I googled for some pictures of books from the time period and fitted them to size, see above.
View attachment 46057
After cutting and fitting we have three shelfs of reading materials for the King during his voyages.
View attachment 46056
And with the door and glass in front of it. Now the door needs finishing with veneer.
View attachment 46058
And again dry fitting.