Finally some time in the workshop after a lot of weekends working in the garden.
It will be a lot of repetative work as I started on the SB railing.



The railing is colored with black ecoline ink and when finished sealed with oil. Below before and after oil finishing.


As an in between I also prepared all eye bolts and rings for the fore castle deck.


Secondly I tested an idea for the scuppers. these were fitted with sailcloth sleeves which work as a non return valve. When sea water is reaching the scupper from outside the sleeve is then closing avoiding water to some onto the deck. From pieces of silk cloth which I shaped around a needle file and glued with CA I made this.



I still have to colour them with a wash of Stockholm tar with turpentine but that I still have to test.
				
			It will be a lot of repetative work as I started on the SB railing.



The railing is colored with black ecoline ink and when finished sealed with oil. Below before and after oil finishing.


As an in between I also prepared all eye bolts and rings for the fore castle deck.


Secondly I tested an idea for the scuppers. these were fitted with sailcloth sleeves which work as a non return valve. When sea water is reaching the scupper from outside the sleeve is then closing avoiding water to some onto the deck. From pieces of silk cloth which I shaped around a needle file and glued with CA I made this.



I still have to colour them with a wash of Stockholm tar with turpentine but that I still have to test.
			
				Last edited: 
			
		
	
								
								
									
	
								
							
							 
	
 
 
		
 
 
		



 
 
		



 
 
		


 
 
		 .
.
