PROTOTYPE - H.M.S. Ontario Cross Section 2.0 [COMPLETED BUILD]

Hold Area:

The forward area of the model contains storage rooms and the powder room on a platform located just above the keelson. The lower deck clamps and lower deck beams 6 and 8 were installed where the fore the fore and aft bulkheads are defining the power room area. This set of photos shows the progress on the framing for the platform and walls. A few design changes are shown on the preliminary hold drawing for the platform framing.

IMG_2934.JPGIMG_2936.JPGIMG_2937.JPGIMG_2938.JPGIMG_2934.JPGIMG_2936.JPGIMG_2937.JPGIMG_2938.JPGIMG_2942.JPGIMG_2954.JPGIMG_2955.JPGIMG_2956.JPGIMG_2959.JPGIMG_2960.JPGIMG_2961.JPGIMG_2962.JPGIMG_2965.JPG
 
I did not like the way the pine planking looked so I removed it and used mahogany. When I made the wall details, I forgot to add the notch for the lower beam, I used some card stock for templates. I added a little finish to the storage rooms to see if there was any improvement, I think there was some. This is a few progress photos.IMG_2978.JPGIMG_2979.JPGIMG_2980.JPGIMG_2981.JPGIMG_2982.JPGIMG_2983.JPGIMG_2984.JPGIMG_2985.JPGIMG_2986.JPGIMG_2987.JPGIMG_2988.JPGIMG_2989.JPGIMG_2990.JPGIMG_2991.JPGIMG_2992.JPG
 
Back
Top