Sovereign of the Seas Mantua 1:78 Greatly Enhanced - Vince P. [COMPLETED BUILD]
Installing the blocks for the lifts and jeers on the mainmast tops. Also the lift and sister block for hoisting and lowering the lower yard, and the forward halves of the mizzen stays.
Vince P.


For those of you that might build this kit from Mantua, here is some info on errors in the plans:
After I set the completed foremast on the ship, I started looking into the mainmast. The plans call for cutting the lower section to 360mm. I set this piece down into the ship temporarily and something did not look right. According to other completed models and some drawings of the actual SOS, the lower crowsnest of the mainmast should be slightly higher that the same on the foremast. The top rail of the crowsnest on the foremast is about even with the tree on the mainmast. With the mainmast section cut to 360mm as detailed in the plans, the crowsnest is considerably lower than the foremast. In order for the mainmast crowsnest to sit at the correct level, it was necessary to increase the lower section to 407mm from 360mm.
Along with this, it is necessary to adjust the mizenmast to correspond to the change in height of the mainmast. The plans call for the lower section of the mizenmast to be 320mm. Increase this to 385mm. Then all of the mast tops are in correct alignment.
Vince P.

Since I am completely assembling the masts off ship, I wrap the lower shrouds to be rigged later on the ship. The shrouds are wrapped in pairs. One piece of rope goes around the mast top from fore to aft to make a pair. Usually the pairs are wrapped starting on the starboard side and then the port side and back to starboard and so on. This ship has 10 shrouds on each side which is 5 pairs to a side. Later when rigging them to the deadeyes, they must be rigged in the correct order starting from the starboard side, pair 1, then to port, pair 1, and back to starboard pair 2, and so on. Also, the shroud in each pair that wraps from the fore side of the mast must be rigged first and then the other in the pair. This is necessary so the shrouds do not bunch up and cross each other at the mast top. You will really see the mess when rattling towards the upper end of the shrouds, if it is not done this way. I simply number the pairs on each side as they are wrapped, and make the forward one of each pair a little longer. Later when rigging them just take them in numerical order and the longer of each pair first.
Vince P.


Parrels for the lower yard on the mainmast. Like I said before on the foremast, the kit does not include these, but it is a nice addition. I bought little parrel kits from Amati and they are the correct scale. They are a little hard to thread and rig, but it is fun.
Vince P.

Hanging the main sail. It is critical to pull the ends tight by passing the earring on the end cringle and pulling outward on both ends. The sail now has no sagging in the middle, which will cause bunching when it is sewn on to the yard. The sewing part comes next.
Vince P.


The main sail is laced to the yard. Next up is to attach the running rigging that starts at the sail and yard.
Vince P.


The main topsail yard in place awaiting running rigging and sail.
Vince P.

The main top gallant yard is mounted and awaiting running rigging and sail.
Vince P.

The main royal yard in place. All of the main yards are now in place. Next comes hanging the sails and running rigging.
Vince P.

The main mast is finished. As I said before, when working on the masts, I am completing as much as possible before stepping them on into the ship. This may seem unorthodox to some, but for me it is a matter of necessity. When assembling the masts and rigging them, especially with sails, it is necessary to rotate them many times in order to access all sides. With the sheer size of this model and the fact that my work bench is in a corner of the room, rotating the whole ship with the masts in place is very cumbersome and somewhat hazardous. Having the mast in a movable table vise makes it very easy to rotate in any direction, even tilting if necessary. After the mast is stepped, it will still be necessary to rotate it some in order to finish the lower shrouds and attach the running rigging to the deck belay points, but nowhere as much as with the masts assembled on the ship. For this model, this method has worked very nicely for me.
Next up is to step the mast and finished it's rigging. That is a fun part that I really enjoy.
Vince P.







