I added the outer gangway trail board to the model. I held off on installing these because they are very prone to being knocked out of place during the rest of the build. I add two pins on the lower edge to each before gluing them in place. I then added the rope gangway ladders. This completes all of the construction details.
The last step was to hoist the main mast banner/commissioning pennant. This was accomplished by making some wooden toggles and glueing the folded banner in place around a short piece of rope with a loop and a toggle.
I still have some minor paint touch up to do an then I will take the final pictures of the USS Constitution cross section. The weather later this week may provide the opportunity to set up outside for them. Some more snow needs to melt on my patio area first.
The last step was to hoist the main mast banner/commissioning pennant. This was accomplished by making some wooden toggles and glueing the folded banner in place around a short piece of rope with a loop and a toggle.
I still have some minor paint touch up to do an then I will take the final pictures of the USS Constitution cross section. The weather later this week may provide the opportunity to set up outside for them. Some more snow needs to melt on my patio area first.