Just a quick update. I finally got to play with my new drill bits (which I put aside while making the skylight) and they work just fine drilling into brass, so I'll working on the canopy frames once again.
Another quick update on brass drilling. Yes, the new bits drilled through the brass...until they didn't. If you look back, I made a diagram of how I was going to the drill brass blocks. Basically, each block requires two holes, some passing all the way through the block, and others only halfway. Each block required two set ups on the drill press. I was lucky if my new drill bits lasted two blocks before they quickly dulled up or broke. On moment they were drilling, the next they weren't. One didn't even drill from the start. I actually bought bits from three sources, my original bits from either Model Expo or Micro-Mark, a full set from
AliExpress, and two Gyros #75 packages and one Gyros #67 each containing 12 bits/pkg. The AliExpress #67 bit broke immediately upon touching the brass and the #75 went dull. The Gyros went dull after a couple of holes. I was using a light touch, not jamming the drill into the brass.
After all this, I don't have much to show for my efforts, just two cleanly drilled brass blocks. So I will admit defeat and go to plan B, Styrene plastic. The drill bits cut through in seconds, and cutting the blocks off from the bar requires just a sharp knife instead of a fine tooth saw or cutting disk. Hopefully, the brass painted blocks will blend in with all the brass rod that make up the canopies.
I am taking my canopy frame fabrication cues from several builders but am using 1/32” brass tube instead of 1/32” brass rod as many other builders have used for the vertical components. This allows me to use a continuous vertical component, passing through the junction blocks and decorative balls to just beyond the top railing. Then the overhead canopy support made of 0.02” brass rod can be inserted into the 1/32” tube creating a strong mechanical connection. The 0.06” blocks will only support the horizontal rails with no stress. The brass balls are strictly ornamental and provide no support. The tricky part is where the canopy arches all meet at the top. A hub piece will be used to connect all the arches plus the finial. The finial is to be comprised of a rod and tube configuration (TBD), and filed into its final shape and inserted into the hub. The vertical framework base will be inserted into rings made from 1/16” tubes, embedded into the grating wood frames. Here is a summary of the materials:
- Base of vertical component: 1/16” brass tube – K&S Engineering No. 5125
- Vertical component: 1/32” brass tube– K&S Engineering No. 815035
- Horizontal component: 1/32” brass rod - K&S Engineering No.
- Junction blocks: 0.06” Styrene square rod – Evergreen No. 223
- Ornament: 1/32” brass balls – Tribal Desert from Etsy
- Junction hub: 3/32” styrene tube – Evergreen No. 153
So here is my plan based on the US Navy plans and the trial prototypes of the vertical components and the canopy hub element to see if this would work. The prototype is purely concept, so it is not adjusted for proper dimensions or glued and yet it stands on its own. The final image shows the styrene painted brass. It appears it just might work.
