Thanks for all the likes and encouraging remarks. I'm beginning to see the light at the end of the tunnel and will need to start planning my next build.
Yesterday I started putting sails on the main mast, this time I started with the lower one first, it's much easier. When it came to belaying the lines I found an error with the instructions.
View attachment 258735
I followed the instructions adding the pin rails as shown.
View attachment 258736
Working from the rigging plan there's two extra pin rails required.
View attachment 258738
With the stairs and the cannon there's not enough room for the pin rail and the ropes.
View attachment 258737
I've added a pin rail between the stairs, I would like to have put it closer to the mast but I had to leave room for the capstan.
View attachment 258739
I needed to drill two holes in the deck for the pin rails, the dust was cleaned up using sellotape held with tweezers.