- Joined
- Nov 30, 2024
- Messages
- 79
- Points
- 78

Lovely work again Tony and some nice additionsVideo 6 - Complete (Part 2)
More work on the hold items.
I decided to add to the items in the hold, so I scratch built a few boxes and crates and filled some with rope.
View attachment 520818
View attachment 520819
View attachment 520820
View attachment 520821
View attachment 520822
View attachment 520823
View attachment 520824
View attachment 520825
I read that there would have been timber for the carpenter to do repairs so I added a small amount just to add some more interest
View attachment 520826
The support posts have now been added. I ignored the instructions stating the length of each individual post and used the beams as a guide to measure how high each post needed to be. I didn't trust that my fitting of the internal planking and the rooms etc would be 100% accurate. So starting at one end of the ship I gradually added the beams measuring the length each post needed to be.
View attachment 520827
View attachment 520828
A dry fit of the Orlop deck confirmed the extra work was worth it.
View attachment 520829
View attachment 520831
Thanks for looking
T
.
View attachment 520830
