Good evening all,
I reset the vertical partial ribs by filling in with additional ribs sections, this made more sense than removing and replacing the pieces. The width of the aft openings is still 2mm too narrow. I will adjust this after I remove the upper section of the jig giving me room to operate.
View attachment 543571
I began setting the lower support columns, they are heavily charred. For alignment I set a stringline on the port side of the keelson and used a 90deg angle off the top of the keelson.
View attachment 543572View attachment 543573View attachment 543574
This shows the layout. Typically, one would need to wait till all columns are set and the top longitudinal beam set on them before you would know for sure if the deck beams will set in correctly. I'll need to find a way to periodically check this deck beam fit, it's a lot of work to go through to not have a good fit.
View attachment 543585
Thanks for checking, till next time!
What's up with having to use the attachment editor on almost every photo??