• SUBSCRIBE TO SHIPS IN SCALE TODAY!

    The beloved Ships in Scale Magazine is back and charting a new course for 2026!
    Discover new skills, new techniques, and new inspirations in every issue.

    NOTE THAT OUR NEXT ISSUE WILL BE MARCH/APRIL 2026
  • Win a Free Custom Engraved Brass Coin!!!
    As a way to introduce our brass coins to the community, we will raffle off a free coin during the month of August. Follow link ABOVE for instructions for entering.

Modelship Dockyard - New Kit [Modelship Dockyard] PoF H.M.S. Enterprize 1774, the 1/48 version!

Hi guys,

This week the frieze will be avaliable to order through Dry dock models and parts. Regading the rigging, we have finished the designing in 3D, and a modeller who have bought have built the rigging based on what we have (the following images), we still think it would be the best if we can test it ourselves, as we have found some errors and there could still be imporvements that we can make.
1778579746899.jpeg
1778579758877.jpeg
The rigging piloting will be based on the hull that I'm currently building, which have been halted because of the gunboat build and some other matters.
While the gunboat is now finished, the highest priority will be the build of the new model of enterprize. The aim is to finish the hull by mid July, and the rigging by the end of September.
There was the thought of opening pre-order for the rigging and giving out discounts, but the final decision is to provide everyone who have bought the kit before March 2026 a discount, so the pre-order won't matter.
The build log will be continued very soon. Sorry to everyone for the waiting.

Victor
 
Hi guys,

This week the frieze will be avaliable to order through Dry dock models and parts. Regading the rigging, we have finished the designing in 3D, and a modeller who have bought have built the rigging based on what we have (the following images), we still think it would be the best if we can test it ourselves, as we have found some errors and there could still be imporvements that we can make.
View attachment 602237
View attachment 602238
The rigging piloting will be based on the hull that I'm currently building, which have been halted because of the gunboat build and some other matters.
While the gunboat is now finished, the highest priority will be the build of the new model of enterprize. The aim is to finish the hull by mid July, and the rigging by the end of September.
There was the thought of opening pre-order for the rigging and giving out discounts, but the final decision is to provide everyone who have bought the kit before March 2026 a discount, so the pre-order won't matter.
The build log will be continued very soon. Sorry to everyone for the waiting.

Victor
Fantastic!! So glad to see this is still in the works!!
 
I assume the new Rigging being designed is for the Enterprise 1:48 Version? Was this mentioned already?
 
Back
Top