The 3rd deck is being dressed.
The full upper deck is yet to come, plus the forecastle at the bow, the quarterdeck and the poop at the rear.
The central street is slatted in walnut stained rosewood, edged with ebony rods, the rest in limewood (under construction). The walling of the wall was done and painted in red, the mooring rings of the guns laid. The surfacing will continue upward with the 4th deck.
The base of the main mast is also manufactured.
A last look at the lower decorations (partially visible through the doors and stairs):
Laying the planking:
Mast base:
The full upper deck is yet to come, plus the forecastle at the bow, the quarterdeck and the poop at the rear.
The central street is slatted in walnut stained rosewood, edged with ebony rods, the rest in limewood (under construction). The walling of the wall was done and painted in red, the mooring rings of the guns laid. The surfacing will continue upward with the 4th deck.
The base of the main mast is also manufactured.
A last look at the lower decorations (partially visible through the doors and stairs):
Laying the planking:
Mast base: