Video 14 - (Part 1)
Posts, beams & lights.
View attachment 602597
To make this post the instructions would have you carve the piece from one piece of timber. I thought this was an odd way to do this. I simply glued one strip to another strip and rounded off the edges. Much easier.
View attachment 602598
View attachment 602599
View attachment 602600
Onto the white posts. I temporally fitted the beams as I wanted to check the heights of each beam accordingly. I found that there was half a millimetre here and there to adjust.
View attachment 602596
The tool for making the round profile worked well. Much better than the one for grooving the beams.
View attachment 602601
Getting posts square.
View attachment 602602
View attachment 602603
View attachment 602606
Ancora rope in place, but I did have a mini problem. I attc hed the rope with CA, all was going well until the rope started to turn white. Luckily I managed the remove it without too much damage. I changed tack for my second attempt and used Tacky Craft Glue which worked well.
View attachment 602604
At this point I dry fitted the lower gun deck and test fitted the masts. All was fine. Perfectly in line and the rake looked OK.
View attachment 602605
View attachment 602607
Onto the lights. This deck was a lot easier than the hold. I had learned a lot from that experience. I made much more of an effort to deepen and widen the groove and I used some other wire I had purchased. It was slightly wider than the supplied wire but it was pre-tinned which was great. I think the wire used in the kit is 32 gauge, this new stuff is 30 gauge. Also it was a breeze to strip using my thumb nail. Happy days!
View attachment 602608
View attachment 602609
View attachment 602610
View attachment 602611
Thanks for watching.