- Joined
- Nov 30, 2024
- Messages
- 137
- Points
- 103

Instructions video #28 completed
In this part I prepare and fit various details on the middle gun deck including gratings, shot racks and shot, stairs to the lower gun deck, capstans, the galley aft of the stove area and the ward room pantry towards the stern. The following photos should be self explanatory. One issue I did have was that the 2 capstans coming up from the lower gun deck protruded too high through the middle deck for some reason, so I had to make some adaptations so the middle deck capstans sat at the correct height. Finally in this video I file out a groove and enlarge the hole at the bow bulkhead to test fit the bowsprit for fitting in the future





















In this part I prepare and fit various details on the middle gun deck including gratings, shot racks and shot, stairs to the lower gun deck, capstans, the galley aft of the stove area and the ward room pantry towards the stern. The following photos should be self explanatory. One issue I did have was that the 2 capstans coming up from the lower gun deck protruded too high through the middle deck for some reason, so I had to make some adaptations so the middle deck capstans sat at the correct height. Finally in this video I file out a groove and enlarge the hole at the bow bulkhead to test fit the bowsprit for fitting in the future















































































